Patrick Mechanical was brought on as the project general contractor for the installation of a 150KPPH Boiler
Lessons Learned
- Developing tandem lifting plans with consideration to bearing capacity & ground pressure mitigation.
- Large scale equipment coordination and logistics.
- Advanced troubleshooting of boiler operation and startup.
Installation
This scope involved the removal of the existing temporary mobile boiler in order to allow for the installation of a 150 KPPH boiler which included a foundation, piping, and structural steel support structure.
Our Services
The Full Package from concept to completion – our team of industry experts, engineers and tradespeople can take on and deliver on every aspect of your project’s construction.