Patrick Mechanical Ltd

Remarkable Installation of a 150KPPH Boiler at Domtar

blue prints of boiler installation by patrick mechanical
Domtar 150KPPH Boiler Installation (2019)

Project Overview

Challenges & Solutions

 

The project posed several logistical and technical challenges, which Patrick Mechanical addressed through key solutions:

  • Tandem Lifting Plans: Developed detailed plans to safely execute tandem lifts while considering bearing capacity and mitigating ground pressure.
 
  • Equipment Coordination: Successfully managed the logistics and coordination of large-scale equipment for the installation.
 
  • Advanced Troubleshooting: Our team tackled complex boiler operation and startup troubleshooting, ensuring the system was fully operational and efficient.

Results & Impact

 

Patrick Mechanical’s efficient management and execution of the 150KPPH boiler installation ensured the project was completed on time and within scope. By overcoming challenges related to heavy equipment handling and precise installation requirements, the team demonstrated its technical expertise and problem-solving abilities, resulting in a smooth transition from the temporary to permanent boiler system.