Remarkable Installation of a 150KPPH Boiler at Domtar


Project Overview
-
In 2019, Patrick Mechanical Ltd. was selected as the general contractor for the installation of a 150KPPH boiler at Domtar. The project involved the removal of an existing temporary mobile boiler and the subsequent installation of the new boiler, including its foundation, piping systems, and structural steel support. This large-scale project required precise coordination and expertise to ensure the successful integration of the new equipment into the facility.
Challenges & Solutions
The project posed several logistical and technical challenges, which Patrick Mechanical addressed through key solutions:
- Tandem Lifting Plans: Developed detailed plans to safely execute tandem lifts while considering bearing capacity and mitigating ground pressure.
- Equipment Coordination: Successfully managed the logistics and coordination of large-scale equipment for the installation.
- Advanced Troubleshooting: Our team tackled complex boiler operation and startup troubleshooting, ensuring the system was fully operational and efficient.
Results & Impact
Patrick Mechanical’s efficient management and execution of the 150KPPH boiler installation ensured the project was completed on time and within scope. By overcoming challenges related to heavy equipment handling and precise installation requirements, the team demonstrated its technical expertise and problem-solving abilities, resulting in a smooth transition from the temporary to permanent boiler system.