Patrick Mechanical’s Smelter Converter Aisle Crane Rail System
Patrick Mechanical was awarded this project in 2015 (17 days) and 2018 (19 days)
Patrick Mechanical’s Remarkable Installation of a 150KPPH Boiler at Domtar
This scope involved the removal of the existing temporary mobile boiler in order to allow for the installation of a 150 KPPH boiler which included a foundation, piping, and structural steel support structure.