Patrick Mechanical was brought on as the project general contractor for the installation of a 150KPPH Boiler
Lessons Learned
Developing tandem lifting plans with consideration to bearing capacity & ground pressure mitigation.
Large scale equipment coordination and logistics.
Advanced troubleshooting of boiler operation and startup.
Installation
This scope involved the removal of the existing temporary mobile boiler in order to allow for the installation of a 150 KPPH boiler which included a foundation, piping, and structural steel support structure.